§ 13.08.405. Construction methods and materials.  


Latest version.
  • The size, slope, depth, alignment and materials of the construction of a building sewer, private sewer or sanitary sewer, and the methods to be used in excavating, placing of the pipe, jointing, testing, backfilling the trench and patching, shall all conform to the requirements of the superintendent of public works, the city engineer and/or any other applicable rules and regulations of the city.

(C.O.83-52 § 60 (Art. II § 9))