§ 15.09.030. Notice and permit for conversion.  


Latest version.
  • A.

    No later than three months prior to the recording of a master deed under M.G.L. c. 183A of any residential unit to a condominium unit or cooperative unit, the owner shall provide notice of such conversion to the board of assessors and the building inspector and shall obtain from the building inspector a conversion permit. Further, within forty-eight hours of recording of the master deed, a copy of the master deed shall be provided to the board of assessors. Upon the giving of such notice, the following shall occur:

    1.

    The health department shall make an inspection of the units to determine if the same are in compliance with all applicable provisions of the State Sanitary Code and the applicable rules and regulations of the board of health.

    2.

    The building department shall make an inspection of the units to determine if the same are in compliance with all applicable provisions of the State Building Code, the Fire Safety Code and the rules and regulations of all other regulatory agencies of the city of Revere.

    3.

    For any building or structure with ten or less units, the DPW water and sewer billing department shall make an inspection to confirm that each unit has a separate water meter.

    B.

    The building inspector shall issue a conversion permit only after confirming that: (1) the assessors office has been properly notified of the conversion; (2) each unit complies with all Sanitary Code, Fire Safety Code, Building Code and other regulatory requirements and has a valid occupancy permit for each unit; and (3) for buildings with ten or less units, each unit has a separate water meter. The fee for such conversion permit shall be established from time to time by the building inspector.

(C.O. 07-525, § 1, 12-10-2007)